concrete-retaining-walls1. A simple footing structure is constructed first
2. The blocks are hoisted from the back of a flat bed truck into position (no double handling)
3. The blocks are then filled with concrete
4. Waterproofing is then applied if necessary
5. After 24 hours, an appropriate drainage system is placed and the wall is then backfilled